An Inspiring Home is Closer Than You Think
Remodeling projects can be huge undertakings. We won’t use shoddy building materials or prescribe “quick fixes.” Quality takes time. That’s all there is to it. It wouldn’t be the same without it.
Depending on your budget, pricing varies greatly from project to project. We will tell you what ideas will work and what won’t during our initial conversation.
Check out the pricing below to get a better idea of what some of our projects cost. Remember, these are pricing based on past work we’ve completed. Every project is unique, and final costs will be provided.
HOW MUCH DOES IT COST TO REMODELING YOUR BATHROOM IN 2024-2025
Sitework
Job Site Preparation
Ensuring Safety with Dust Isolation and Temporary Walls as Needed
Manage Job Access by Installing Temporary Doors and Zip Walls
Safeguard your flooring’s finish by using a combination of rosin paper and hardboard
Our team ensures that the site is left spotless each day
For the duration of the project, all debris will be removed to the garage and disposed every week
Bathroom Demolition
All Demolition for Bathroom
Disconnect all bath fixtures and electrical components as needed
As needed, remove cabinetry and other finish
Complete bathroom demolition down to the studs
Remove any fixtures / appliances
Remove all walls and ceiling down to the studs
Remove all nails and clean joist
Removing the Finish Flooring
Sweep / vacuum
Remove all nails and clean joist
Remove the subfloor as necessary to install new plumbing
Framing
Wall framing for Bathroom will be install By Building Code
All plumbing fixtures and framing same lacation
Remove and replace sub floor as required for new plumbing
Framing walls for shower / tub, frame a in wall niche per print
Install all blocking and nailers as required by code
Insulation
All Insulation for Bathroom will be install By Building Code
Walls – Install R-15/19 Paper face Insulation
Ceiling – Install R-15/32 Paper face Insulation
Insulation, air/fire stopping for new construction
To ensure safety, it’s vital to install fire-stopping rock wool and caulking at all openings and penetrations
Plumbing
All Plumbing for Bathroom will be install By Building Code
Owner to provide all plumbing fixtures
Toilet – Same Location
Install toilet drain and install new flange
Install new supply line and valve if necessary
Install toilet
Tub/Shower – Same Location
Rough in and supply for new tub/shower
Connect into existing vent
Install tub/shower
Install shower/tub valve and faucets
Install rough in waste and supply lines for shower/tub
Vanity Sink – Same Location
Install rough in waste and supply lines for vanity sink
Connect into existing vent
Install new sink and faucet
Electrical
All Electrical for Bathroom will be install By Building Code
Owner to provide all electrical fixtures
Furnish all electrical components necessary for the project
Disconnect any necessary wiring and reconfigure as needed
Supply and install new exhausts fan/light combo
Install wire for vanity light and mirror
Install new GFCI
Supply and install new led Ceiling Recessed Light per print
Hvac
All HVAC for Bathroom will be install By Building Code
Vent bathroom fan to exterior, using existing or new solid vent
Existing heating vent to remain as is and install new vent cover
Drywall
All Drywall for Bathroom
Install 1/2″ green board (GWB) on all walls and ceilings, (Ultralightweight drywall with moisture and mold resistance)
Matching existing finishes and patching up as necessary
Tape and metal/paper corners for all joints
Apply two coat plaster veneer finish
Sanding all drywall area and prepare for primer
Finish Carpentry
All Finish Carpentry for Bathroom
Install Door and Window casings
Install all paint grade door and window casings to match existing
Install floor baseboards
Install all baseboard trim
Paint grade baseboard
Matching the existing baseboard as needed
Tiles
All Tiles For Bathroom
Owner to provide all Tiles, Grout,
Install cement backerboard for all floors and shower walls
Bathroom Floor Tiles: up to 50 – 60 sf
Install all bathroom floor tiles as selected by owner
Use Latex modified thinnest mortar
Grout all new floor tiles
Shower / tub Surround Tiles: up to 50 – 80 sf
Install all shower/tub tiles
Grout all new shower/tub tiles
Caulk junctions at corners shower and tub
Grout all new tile
Cabinetry
Vanity For Bathroom
Owner to provide all vanity, countertop
Install new vanity cabinet as selected by owner
Install new vanity mirror as selected by owner
Painting
Painting For Bathroom
Apply one full coat of primer to all interior walls, ceilings and trims
Fill and compound all necessary area and prepare for paint
Caulk all trim work
Apply two full coat of finish paint (any color) to walls/ceiling and door/trim (semigloss finish)
Final Cleanup
Cleanup For Bathroom
Final job site cleanup
Removal of all materials and waste.
Cleaning service as required if necessary
Project Managements Details
Rest assured that all permitting and inspection fees are covered in the project. Here’s what else you can expect in terms of project management:
A dedicated project manager will be assigned to oversee the job
Detailed architectural print and 3d design, including tiles and all fixtures
A job folder will be prepared with all relevant plans, details, and specifications
Daily job status updates will be provided
Scheduled project walk-through meetings will occur
A CLIENT PORTAL project website will be set up to manage project schedules, documents, and contacts
Sitework
Job Site Preparation
Ensuring Safety with Dust Isolation and Temporary Walls as Needed
Manage Job Access by Installing Temporary Doors and Zip Walls
Safeguard your flooring’s finish by using a combination of rosin paper and hardboard
Our team ensures that the site is left spotless each day
For the duration of the project, all debris will be removed to the garage and disposed every week
Bathroom Demolition
All Demolition for Bathroom
Disconnect all bath fixtures and electrical components as needed
As needed, remove cabinetry and other finish
Complete bathroom demolition down to the studs
Remove any fixtures / appliances
Remove all walls and ceiling down to the studs
Remove all nails and clean joist
Removing the Finish Flooring
Sweep / vacuum
Remove all nails and clean joist
Remove the subfloor as necessary to install new plumbing
Framing
Wall framing for Bathroom will be install By Building Code
All plumbing fixtures and framing same lacation
Remove and replace sub floor as required for new plumbing
Framing walls for shower / tub, frame a in wall niche per print
Install all blocking and nailers as required by code
Insulation
All Insulation for Bathroom will be install By Building Code
Walls – Install R-15/19 Paper face Insulation
Ceiling – Install R-15/32 Paper face Insulation
Insulation, air/fire stopping for new construction
To ensure safety, it’s vital to install fire-stopping rock wool and caulking at all openings and penetrations
Plumbing
All Plumbing for Bathroom will be install By Building Code
Owner to provide all plumbing fixtures
Toilet – Same Location
Install toilet drain and install new flange
Install new supply line and valve if necessary
Install toilet
Tub/Shower – Same Location
Rough in and supply for new tub/shower
Connect into existing vent
Install tub/shower
Install shower/tub valve and faucets
Install rough in waste and supply lines for shower/tub
Vanity Sink – Same Location
Install rough in waste and supply lines for vanity sink
Connect into existing vent
Install new sink and faucet
Electrical
All Electrical for Bathroom will be install By Building Code
Owner to provide all electrical fixtures
Furnish all electrical components necessary for the project
Disconnect any necessary wiring and reconfigure as needed
Supply and install new exhausts fan/light combo
Install wire for vanity light and mirror
Install new GFCI
Supply and install new led Ceiling Recessed Light per print
Hvac
All HVAC for Bathroom will be install By Building Code
Vent bathroom fan to exterior, using existing or new solid vent
Existing heating vent to remain as is and install new vent cover
Drywall
All Drywall for Bathroom
Install 1/2″ green board (GWB) on all walls and ceilings, (Ultralightweight drywall with moisture and mold resistance)
Matching existing finishes and patching up as necessary
Tape and metal/paper corners for all joints
Apply two coat plaster veneer finish
Sanding all drywall area and prepare for primer
Finish Carpentry
All Finish Carpentry for Bathroom
Install Door and Window casings
Install all paint grade door and window casings to match existing
Install floor baseboards
Install all baseboard trim
Paint grade baseboard
Matching the existing baseboard as needed
Tiles
All Tiles For Bathroom
Owner to provide all Tiles, Grout,
Install cement backerboard for all floors and shower walls
Bathroom Floor Tiles: up to 60 – 100 sf
Install all bathroom floor tiles as selected by owner
Use Latex modified thinnest mortar
Grout all new floor tiles
Shower / tub Surround Tiles: up to 60 – 100 sf
Install all shower/tub tiles
Grout all new shower/tub tiles
Caulk junctions at corners shower and tub
Grout all new tile
Cabinetry
Vanity For Bathroom
Owner to provide all vanity, countertop
Install new vanity cabinet as selected by owner
Install new vanity mirror as selected by owner
Painting
Painting For Bathroom
Apply one full coat of primer to all interior walls, ceilings and trims
Fill and compound all necessary area and prepare for paint
Caulk all trim work
Apply two full coat of finish paint (any color) to walls/ceiling and door/trim (semigloss finish)
Final Cleanup
Cleanup For Bathroom
Final job site cleanup
Removal of all materials and waste.
Cleaning service as required if necessary
Project Managements Details
Rest assured that all permitting and inspection fees are covered in the project. Here’s what else you can expect in terms of project management:
A dedicated project manager will be assigned to oversee the job
Detailed architectural print and 3d design, including tiles and all fixtures
A job folder will be prepared with all relevant plans, details, and specifications
Daily job status updates will be provided
Scheduled project walk-through meetings will occur
A CLIENT PORTAL project website will be set up to manage project schedules, documents, and contacts
Sitework
Job Site Preparation
Ensuring Safety with Dust Isolation and Temporary Walls as Needed
Manage Job Access by Installing Temporary Doors and Zip Walls
Safeguard your flooring’s finish by using a combination of rosin paper and hardboard
Our team ensures that the site is left spotless each day
For the duration of the project, all debris will be removed to the garage and disposed every week
Bathroom Demolition
All Demolition for Bathroom
Disconnect all bath fixtures and electrical components as needed
As needed, remove cabinetry and other finish
Complete bathroom demolition down to the studs
Remove any fixtures / appliances
Remove all walls and ceiling down to the studs
Remove all nails and clean joist
Removing the Finish Flooring
Sweep / vacuum
Remove all nails and clean joist
Remove the subfloor as necessary to install new plumbing
Framing
Wall framing for Bathroom will be install By Building Code
Relocate the wall to make room for tub or shower
Remove and replace sub floor as required for new plumbing
Framing walls for shower / tub, frame a in wall niche per print
Install all blocking and nailers as required by code
Insulation
All Insulation for Bathroom will be install By Building Code
Walls – Install R-15/19 Paper face Insulation
Ceiling – Install R-15/32 Paper face Insulation
Insulation, air/fire stopping for new construction
To ensure safety, it’s vital to install fire-stopping rock wool and caulking at all openings and penetrations
Plumbing
All Plumbing for Bathroom will be install By Building Code
Owner to provide all plumbing fixtures
Toilet
Install rough toilet drain and install new flange
Install new supply line and valve
Install toilet
Tub/Shower
Rough in and supply for new tub/shower
Connect into existing vent
Install tub/shower
Install shower/tub valve
Install rough in waste and supply lines for shower/tub
Install New Vanity Sink
Install rough in waste and supply lines for vanity sink
Connect into existing vent
Install new sink and faucet
Electrical
All Electrical for Bathroom will be install By Building Code
Owner to provide all electrical fixtures
Furnish all electrical components necessary for the project
Disconnect any necessary wiring and reconfigure as needed
Supply and install new exhausts fan/light combo
Install wire for vanity light and mirror
Install new GFCI
Supply and install new led Recessed Light per print
Hvac
All HVAC for Bathroom will be install By Building Code
Vent bathroom fan to exterior, using existing or new solid vent
Existing heating vent to remain as is and install new vent cover
Drywall
All Drywall for Bathroom
Install 1/2″ green board (GWB) on all walls and ceilings, (Ultralightweight drywall with moisture and mold resistance)
Matching existing finishes and patching up as necessary
Tape and metal/paper corners for all joints
Apply two coat plaster veneer finish
Sanding all drywall area and prepare for primer
Finish Carpentry
All Finish Carpentry for Bathroom
Install Door and Window casings
Install all paint grade door and window casings to match existing
Install floor baseboards
Install all baseboard trim
Paint grade baseboard
Matching the existing baseboard as needed
Tiles
All Tiles For Bathroom
Owner to provide all Tiles, Grout,
Install cement backerboard for all floors and shower walls
Bathroom Floor Tiles: up to 50 – 200 sf
Install all bathroom floor tiles as selected by owner
Use Latex modified thinnest mortar
Grout all new floor tiles
Shower / tub Surround Tiles: up to 100 – 200 sf
Install all shower/tub tiles
Grout all new shower/tub tiles
Caulk junctions at corners shower and tub
Grout all new tile
Cabinetry
Vanity For Bathroom
Owner to provide all vanity, countertop
Install new vanity cabinet as selected by owner
Install new vanity mirror as selected by owner
Painting
Painting For Bathroom
Apply one full coat of primer to all interior walls, ceilings and trims
Fill and compound all necessary area and prepare for paint
Caulk all trim work
Apply two full coat of finish paint (any color) to walls/ceiling and door/trim (semigloss finish)
Final Cleanup
Cleanup For Bathroom
Final job site cleanup
Removal of all materials and waste.
Cleaning service as required if necessary
Project Managements Details
Rest assured that all permitting and inspection fees are covered in the project. Here’s what else you can expect in terms of project management:
A dedicated project manager will be assigned to oversee the job
Detailed architectural print and 3d design, including tiles and all fixtures
A job folder will be prepared with all relevant plans, details, and specifications
Daily job status updates will be provided
Scheduled project walk-through meetings will occur
A CLIENT PORTAL project website will be set up to manage project schedules, documents, and contacts
Sitework
Job Site Preparation
Ensuring Safety with Dust Isolation and Temporary Walls as Needed
Manage Job Access by Installing Temporary Doors and Zip Walls
Safeguard your flooring’s finish by using a combination of rosin paper and hardboard
Our team ensures that the site is left spotless each day
For the duration of the project, all debris will be removed to the garage and disposed every week
Bathroom Demolition
All Demolition for Bathroom
Disconnect all bath fixtures and electrical components as needed
As needed, remove cabinetry and other finish
Complete bathroom demolition down to the studs
Remove any fixtures / appliances
Remove all walls and ceiling down to the studs
Remove all nails and clean joist
Removing the Finish Flooring
Sweep / vacuum
Remove all nails and clean joist
Remove the subfloor as necessary to install new plumbing
Framing
Wall framing for Bathroom will be install By Building Code
Relocate the wall to make room for tub or shower
Remove and replace sub floor as required for new plumbing
Framing walls for shower / tub, frame a in wall niche per print
Install all blocking and nailers as required by code
Insulation
All Insulation for Bathroom will be install By Building Code
Walls – Install R-15/19 Paper face Insulation
Ceiling – Install R-15/32 Paper face Insulation
Insulation, air/fire stopping for new construction
To ensure safety, it’s vital to install fire-stopping rock wool and caulking at all openings and penetrations
Plumbing
All Plumbing for Bathroom will be install By Building Code
Owner to provide all plumbing fixtures
Toilet
Install rough toilet drain and install new flange
Install new supply line and valve
Install toilet
Tub/Shower
Rough in and supply for new tub/shower
Connect into existing vent
Install tub/shower
Install shower/tub valve
Install rough in waste and supply lines for shower/tub
Install New Vanity Sink
Install rough in waste and supply lines for vanity sink
Connect into existing vent
Install new sink and faucet
Electrical
All Electrical for Bathroom will be install By Building Code
Owner to provide all electrical fixtures
Furnish all electrical components necessary for the project
Disconnect any necessary wiring and reconfigure as needed
Supply and install new exhausts fan/light combo
Install wire for vanity light and mirror
Install new GFCI
Supply and install new led Recessed Light per print
Hvac
All HVAC for Bathroom will be install By Building Code
Vent bathroom fan to exterior, using existing or new solid vent
Existing heating vent to remain as is and install new vent cover
Drywall
All Drywall for Bathroom
Install 1/2″ green board (GWB) on all walls and ceilings, (Ultralightweight drywall with moisture and mold resistance)
Matching existing finishes and patching up as necessary
Tape and metal/paper corners for all joints
Apply two coat plaster veneer finish
Sanding all drywall area and prepare for primer
Finish Carpentry
All Finish Carpentry for Bathroom
Install Door and Window casings
Install all paint grade door and window casings to match existing
Install floor baseboards
Install all baseboard trim
Paint grade baseboard
Matching the existing baseboard as needed
Tiles
All Tiles For Bathroom
Owner to provide all Tiles, Grout,
Install cement backerboard for all floors and shower walls
Bathroom Floor Tiles: up to 50 – 200 sf
Install all bathroom floor tiles as selected by owner
Use Latex modified thinnest mortar
Grout all new floor tiles
Shower / tub Surround Tiles: up to 100 – 200 sf
Install all shower/tub tiles
Grout all new shower/tub tiles
Caulk junctions at corners shower and tub
Grout all new tile
Cabinetry
Vanity For Bathroom
Owner to provide all vanity, countertop
Install new vanity cabinet as selected by owner
Install new vanity mirror as selected by owner
Painting
Painting For Bathroom
Apply one full coat of primer to all interior walls, ceilings and trims
Fill and compound all necessary area and prepare for paint
Caulk all trim work
Apply two full coat of finish paint (any color) to walls/ceiling and door/trim (semigloss finish)
Final Cleanup
Cleanup For Bathroom
Final job site cleanup
Removal of all materials and waste.
Cleaning service as required if necessary
Project Managements Details
Rest assured that all permitting and inspection fees are covered in the project. Here’s what else you can expect in terms of project management:
A dedicated project manager will be assigned to oversee the job
Detailed architectural print and 3d design, including tiles and all fixtures
A job folder will be prepared with all relevant plans, details, and specifications
Daily job status updates will be provided
Scheduled project walk-through meetings will occur
A CLIENT PORTAL project website will be set up to manage project schedules, documents, and contacts
34
Years bathroom remodeling and still counting
+670
100s of projects done and still counting
945
100s of designs done and still counting
What Our Clients Are Saying
Rated 5/5 based online reviews from our customers (read reviews)
Our Trusted Trade Partners



Lets build your remodeling dream together!
Contact
Any questions? Get in touch
To receive your FREE BASEMENT ESTIMATE, please take a minute to complete this form. Before we schedule a Free Consultation, we’d like you to know more about your project.