An Inspiring Home is Closer Than You Think
Remodeling projects can be huge undertakings. We won’t use shoddy building materials or prescribe “quick fixes.” Quality takes time. That’s all there is to it. It wouldn’t be the same without it.
Depending on your budget, pricing varies greatly from project to project. We will tell you what ideas will work and what won’t during our initial conversation.
Check out the pricing below to get a better idea of what some of our projects cost. Remember, these are pricing based on past work we’ve completed. Every project is unique, and final costs will be provided.
HOW MUCH DOES IT COST TO REMODELING YOUR BATHROOM IN 2023-2024
Sitework
Job Site Preparation
-
Ensuring Safety with Dust Isolation and Temporary Walls as Needed
-
Manage Job Access by Installing Temporary Doors and Zip Walls
-
Safeguard your flooring’s finish by using a combination of rosin paper and hardboard
-
Our team ensures that the site is left spotless each day
-
For the duration of the project, all debris will be removed to the garage and disposed every week
Bathroom Demolition
All Demolition for Bathroom
-
Disconnect all bath fixtures and electrical components as needed
-
As needed, remove cabinetry and other finish
-
Complete bathroom demolition down to the studs
-
Remove any fixtures / appliances
-
Remove all walls and ceiling down to the studs
-
Remove all nails and clean joist
-
Removing the Finish Flooring
-
Sweep / vacuum
-
Remove all nails and clean joist
-
Remove the subfloor as necessary to install new plumbing
Framing
Wall framing for Bathroom will be install By Building Code
-
All plumbing fixtures and framing same lacation
-
Remove and replace sub floor as required for new plumbing
-
Framing walls for shower / tub, frame a in wall niche per print
-
Install all blocking and nailers as required by code
Insulation
All Insulation for Bathroom will be install By Building Code
-
Walls – Install R-15/19 Paper face Insulation
-
Ceiling – Install R-15/32 Paper face Insulation
-
Insulation, air/fire stopping for new construction
-
To ensure safety, it’s vital to install fire-stopping rock wool and caulking at all openings and penetrations
Plumbing
All Plumbing for Bathroom will be install By Building Code
Owner to provide all plumbing fixtures
Toilet – Same Location
-
Install toilet drain and install new flange
-
Install new supply line and valve if necessary
-
Install toilet
Tub/Shower – Same Location
-
Rough in and supply for new tub/shower
-
Connect into existing vent
-
Install tub/shower
-
Install shower/tub valve and faucets
-
Install rough in waste and supply lines for shower/tub
Vanity Sink – Same Location
-
Install rough in waste and supply lines for vanity sink
-
Connect into existing vent
-
Install new sink and faucet
Electrical
All Electrical for Bathroom will be install By Building Code
Owner to provide all electrical fixtures
-
Furnish all electrical components necessary for the project
-
Disconnect any necessary wiring and reconfigure as needed
-
Supply and install new exhausts fan/light combo
-
Install wire for vanity light and mirror
-
Install new GFCI
-
Supply and install new led Ceiling Recessed Light per print
Hvac
All HVAC for Bathroom will be install By Building Code
-
Vent bathroom fan to exterior, using existing or new solid vent
-
Existing heating vent to remain as is and install new vent cover
Drywall
All Drywall for Bathroom
-
Install 1/2″ green board (GWB) on all walls and ceilings, (Ultralightweight drywall with moisture and mold resistance)
-
Matching existing finishes and patching up as necessary
-
Tape and metal/paper corners for all joints
-
Apply two coat plaster veneer finish
-
Sanding all drywall area and prepare for primer
Finish Carpentry
All Finish Carpentry for Bathroom
-
Install Door and Window casings
-
Install all paint grade door and window casings to match existing
-
Install floor baseboards
-
Install all baseboard trim
-
Paint grade baseboard
-
Matching the existing baseboard as needed
Tiles
All Tiles For Bathroom
Owner to provide all Tiles, Grout,
Install cement backerboard for all floors and shower walls
-
Bathroom Floor Tiles: up to 50 – 60 sf
-
Install all bathroom floor tiles as selected by owner
-
Use Latex modified thinnest mortar
-
Grout all new floor tiles
-
Shower / tub Surround Tiles: up to 50 – 80 sf
-
Install all shower/tub tiles
-
Grout all new shower/tub tiles
-
Caulk junctions at corners shower and tub
-
Grout all new tile
Cabinetry
Vanity For Bathroom
Owner to provide all vanity, countertop
-
Install new vanity cabinet as selected by owner
-
Install new vanity mirror as selected by owner
Painting
Painting For Bathroom
-
Apply one full coat of primer to all interior walls, ceilings and trims
-
Fill and compound all necessary area and prepare for paint
-
Caulk all trim work
-
Apply two full coat of finish paint (any color) to walls/ceiling and door/trim (semigloss finish)
Final Cleanup
Cleanup For Bathroom
-
Final job site cleanup
-
Removal of all materials and waste.
-
Cleaning service as required if necessary
Project Managements Details
Rest assured that all permitting and inspection fees are covered in the project. Here’s what else you can expect in terms of project management:
-
A dedicated project manager will be assigned to oversee the job
-
Detailed architectural print and 3d design, including tiles and all fixtures
-
A job folder will be prepared with all relevant plans, details, and specifications
-
Daily job status updates will be provided
-
Scheduled project walk-through meetings will occur
-
A CLIENT PORTAL project website will be set up to manage project schedules, documents, and contacts
Sitework
Job Site Preparation
-
Ensuring Safety with Dust Isolation and Temporary Walls as Needed
-
Manage Job Access by Installing Temporary Doors and Zip Walls
-
Safeguard your flooring’s finish by using a combination of rosin paper and hardboard
-
Our team ensures that the site is left spotless each day
-
For the duration of the project, all debris will be removed to the garage and disposed every week
Bathroom Demolition
All Demolition for Bathroom
-
Disconnect all bath fixtures and electrical components as needed
-
As needed, remove cabinetry and other finish
-
Complete bathroom demolition down to the studs
-
Remove any fixtures / appliances
-
Remove all walls and ceiling down to the studs
-
Remove all nails and clean joist
-
Removing the Finish Flooring
-
Sweep / vacuum
-
Remove all nails and clean joist
-
Remove the subfloor as necessary to install new plumbing
Framing
Wall framing for Bathroom will be install By Building Code
-
All plumbing fixtures and framing same lacation
-
Remove and replace sub floor as required for new plumbing
-
Framing walls for shower / tub, frame a in wall niche per print
-
Install all blocking and nailers as required by code
Insulation
All Insulation for Bathroom will be install By Building Code
-
Walls – Install R-15/19 Paper face Insulation
-
Ceiling – Install R-15/32 Paper face Insulation
-
Insulation, air/fire stopping for new construction
-
To ensure safety, it’s vital to install fire-stopping rock wool and caulking at all openings and penetrations
Plumbing
All Plumbing for Bathroom will be install By Building Code
Owner to provide all plumbing fixtures
Toilet – Same Location
-
Install toilet drain and install new flange
-
Install new supply line and valve if necessary
-
Install toilet
Tub/Shower – Same Location
-
Rough in and supply for new tub/shower
-
Connect into existing vent
-
Install tub/shower
-
Install shower/tub valve and faucets
-
Install rough in waste and supply lines for shower/tub
Vanity Sink – Same Location
-
Install rough in waste and supply lines for vanity sink
-
Connect into existing vent
-
Install new sink and faucet
Electrical
All Electrical for Bathroom will be install By Building Code
Owner to provide all electrical fixtures
-
Furnish all electrical components necessary for the project
-
Disconnect any necessary wiring and reconfigure as needed
-
Supply and install new exhausts fan/light combo
-
Install wire for vanity light and mirror
-
Install new GFCI
-
Supply and install new led Ceiling Recessed Light per print
Hvac
All HVAC for Bathroom will be install By Building Code
-
Vent bathroom fan to exterior, using existing or new solid vent
-
Existing heating vent to remain as is and install new vent cover
Drywall
All Drywall for Bathroom
-
Install 1/2″ green board (GWB) on all walls and ceilings, (Ultralightweight drywall with moisture and mold resistance)
-
Matching existing finishes and patching up as necessary
-
Tape and metal/paper corners for all joints
-
Apply two coat plaster veneer finish
-
Sanding all drywall area and prepare for primer
Finish Carpentry
All Finish Carpentry for Bathroom
-
Install Door and Window casings
-
Install all paint grade door and window casings to match existing
-
Install floor baseboards
-
Install all baseboard trim
-
Paint grade baseboard
-
Matching the existing baseboard as needed
Tiles
All Tiles For Bathroom
Owner to provide all Tiles, Grout,
Install cement backerboard for all floors and shower walls
-
Bathroom Floor Tiles: up to 60 – 100 sf
-
Install all bathroom floor tiles as selected by owner
-
Use Latex modified thinnest mortar
-
Grout all new floor tiles
-
Shower / tub Surround Tiles: up to 60 – 100 sf
-
Install all shower/tub tiles
-
Grout all new shower/tub tiles
-
Caulk junctions at corners shower and tub
-
Grout all new tile
Cabinetry
Vanity For Bathroom
Owner to provide all vanity, countertop
-
Install new vanity cabinet as selected by owner
-
Install new vanity mirror as selected by owner
Painting
Painting For Bathroom
-
Apply one full coat of primer to all interior walls, ceilings and trims
-
Fill and compound all necessary area and prepare for paint
-
Caulk all trim work
-
Apply two full coat of finish paint (any color) to walls/ceiling and door/trim (semigloss finish)
Final Cleanup
Cleanup For Bathroom
-
Final job site cleanup
-
Removal of all materials and waste.
-
Cleaning service as required if necessary
Project Managements Details
Rest assured that all permitting and inspection fees are covered in the project. Here’s what else you can expect in terms of project management:
-
A dedicated project manager will be assigned to oversee the job
-
Detailed architectural print and 3d design, including tiles and all fixtures
-
A job folder will be prepared with all relevant plans, details, and specifications
-
Daily job status updates will be provided
-
Scheduled project walk-through meetings will occur
-
A CLIENT PORTAL project website will be set up to manage project schedules, documents, and contacts
Sitework
Job Site Preparation
-
Ensuring Safety with Dust Isolation and Temporary Walls as Needed
-
Manage Job Access by Installing Temporary Doors and Zip Walls
-
Safeguard your flooring’s finish by using a combination of rosin paper and hardboard
-
Our team ensures that the site is left spotless each day
-
For the duration of the project, all debris will be removed to the garage and disposed every week
Bathroom Demolition
All Demolition for Bathroom
-
Disconnect all bath fixtures and electrical components as needed
-
As needed, remove cabinetry and other finish
-
Complete bathroom demolition down to the studs
-
Remove any fixtures / appliances
-
Remove all walls and ceiling down to the studs
-
Remove all nails and clean joist
-
Removing the Finish Flooring
-
Sweep / vacuum
-
Remove all nails and clean joist
-
Remove the subfloor as necessary to install new plumbing
Framing
Wall framing for Bathroom will be install By Building Code
-
Relocate the wall to make room for tub or shower
-
Remove and replace sub floor as required for new plumbing
-
Framing walls for shower / tub, frame a in wall niche per print
-
Install all blocking and nailers as required by code
Insulation
All Insulation for Bathroom will be install By Building Code
-
Walls – Install R-15/19 Paper face Insulation
-
Ceiling – Install R-15/32 Paper face Insulation
-
Insulation, air/fire stopping for new construction
-
To ensure safety, it’s vital to install fire-stopping rock wool and caulking at all openings and penetrations
Plumbing
All Plumbing for Bathroom will be install By Building Code
Owner to provide all plumbing fixtures
Toilet
-
Install rough toilet drain and install new flange
-
Install new supply line and valve
-
Install toilet
Tub/Shower
-
Rough in and supply for new tub/shower
-
Connect into existing vent
-
Install tub/shower
-
Install shower/tub valve
-
Install rough in waste and supply lines for shower/tub
Install New Vanity Sink
-
Install rough in waste and supply lines for vanity sink
-
Connect into existing vent
-
Install new sink and faucet
Electrical
All Electrical for Bathroom will be install By Building Code
Owner to provide all electrical fixtures
-
Furnish all electrical components necessary for the project
-
Disconnect any necessary wiring and reconfigure as needed
-
Supply and install new exhausts fan/light combo
-
Install wire for vanity light and mirror
-
Install new GFCI
-
Supply and install new led Recessed Light per print
Hvac
All HVAC for Bathroom will be install By Building Code
-
Vent bathroom fan to exterior, using existing or new solid vent
-
Existing heating vent to remain as is and install new vent cover
Drywall
All Drywall for Bathroom
-
Install 1/2″ green board (GWB) on all walls and ceilings, (Ultralightweight drywall with moisture and mold resistance)
-
Matching existing finishes and patching up as necessary
-
Tape and metal/paper corners for all joints
-
Apply two coat plaster veneer finish
-
Sanding all drywall area and prepare for primer
Finish Carpentry
All Finish Carpentry for Bathroom
-
Install Door and Window casings
-
Install all paint grade door and window casings to match existing
-
Install floor baseboards
-
Install all baseboard trim
-
Paint grade baseboard
-
Matching the existing baseboard as needed
Tiles
All Tiles For Bathroom
Owner to provide all Tiles, Grout,
Install cement backerboard for all floors and shower walls
-
Bathroom Floor Tiles: up to 50 – 200 sf
-
Install all bathroom floor tiles as selected by owner
-
Use Latex modified thinnest mortar
-
Grout all new floor tiles
-
Shower / tub Surround Tiles: up to 100 – 200 sf
-
Install all shower/tub tiles
-
Grout all new shower/tub tiles
-
Caulk junctions at corners shower and tub
-
Grout all new tile
Cabinetry
Vanity For Bathroom
Owner to provide all vanity, countertop
-
Install new vanity cabinet as selected by owner
-
Install new vanity mirror as selected by owner
Painting
Painting For Bathroom
-
Apply one full coat of primer to all interior walls, ceilings and trims
-
Fill and compound all necessary area and prepare for paint
-
Caulk all trim work
-
Apply two full coat of finish paint (any color) to walls/ceiling and door/trim (semigloss finish)
Final Cleanup
Cleanup For Bathroom
-
Final job site cleanup
-
Removal of all materials and waste.
-
Cleaning service as required if necessary
Project Managements Details
Rest assured that all permitting and inspection fees are covered in the project. Here’s what else you can expect in terms of project management:
-
A dedicated project manager will be assigned to oversee the job
-
Detailed architectural print and 3d design, including tiles and all fixtures
-
A job folder will be prepared with all relevant plans, details, and specifications
-
Daily job status updates will be provided
-
Scheduled project walk-through meetings will occur
-
A CLIENT PORTAL project website will be set up to manage project schedules, documents, and contacts
Sitework
Job Site Preparation
-
Ensuring Safety with Dust Isolation and Temporary Walls as Needed
-
Manage Job Access by Installing Temporary Doors and Zip Walls
-
Safeguard your flooring’s finish by using a combination of rosin paper and hardboard
-
Our team ensures that the site is left spotless each day
-
For the duration of the project, all debris will be removed to the garage and disposed every week
Bathroom Demolition
All Demolition for Bathroom
-
Disconnect all bath fixtures and electrical components as needed
-
As needed, remove cabinetry and other finish
-
Complete bathroom demolition down to the studs
-
Remove any fixtures / appliances
-
Remove all walls and ceiling down to the studs
-
Remove all nails and clean joist
-
Removing the Finish Flooring
-
Sweep / vacuum
-
Remove all nails and clean joist
-
Remove the subfloor as necessary to install new plumbing
Framing
Wall framing for Bathroom will be install By Building Code
-
Relocate the wall to make room for tub or shower
-
Remove and replace sub floor as required for new plumbing
-
Framing walls for shower / tub, frame a in wall niche per print
-
Install all blocking and nailers as required by code
Insulation
All Insulation for Bathroom will be install By Building Code
-
Walls – Install R-15/19 Paper face Insulation
-
Ceiling – Install R-15/32 Paper face Insulation
-
Insulation, air/fire stopping for new construction
-
To ensure safety, it’s vital to install fire-stopping rock wool and caulking at all openings and penetrations
Plumbing
All Plumbing for Bathroom will be install By Building Code
Owner to provide all plumbing fixtures
Toilet
-
Install rough toilet drain and install new flange
-
Install new supply line and valve
-
Install toilet
Tub/Shower
-
Rough in and supply for new tub/shower
-
Connect into existing vent
-
Install tub/shower
-
Install shower/tub valve
-
Install rough in waste and supply lines for shower/tub
Install New Vanity Sink
-
Install rough in waste and supply lines for vanity sink
-
Connect into existing vent
-
Install new sink and faucet
Electrical
All Electrical for Bathroom will be install By Building Code
Owner to provide all electrical fixtures
-
Furnish all electrical components necessary for the project
-
Disconnect any necessary wiring and reconfigure as needed
-
Supply and install new exhausts fan/light combo
-
Install wire for vanity light and mirror
-
Install new GFCI
-
Supply and install new led Recessed Light per print
Hvac
All HVAC for Bathroom will be install By Building Code
-
Vent bathroom fan to exterior, using existing or new solid vent
-
Existing heating vent to remain as is and install new vent cover
Drywall
All Drywall for Bathroom
-
Install 1/2″ green board (GWB) on all walls and ceilings, (Ultralightweight drywall with moisture and mold resistance)
-
Matching existing finishes and patching up as necessary
-
Tape and metal/paper corners for all joints
-
Apply two coat plaster veneer finish
-
Sanding all drywall area and prepare for primer
Finish Carpentry
All Finish Carpentry for Bathroom
-
Install Door and Window casings
-
Install all paint grade door and window casings to match existing
-
Install floor baseboards
-
Install all baseboard trim
-
Paint grade baseboard
-
Matching the existing baseboard as needed
Tiles
All Tiles For Bathroom
Owner to provide all Tiles, Grout,
Install cement backerboard for all floors and shower walls
-
Bathroom Floor Tiles: up to 50 – 200 sf
-
Install all bathroom floor tiles as selected by owner
-
Use Latex modified thinnest mortar
-
Grout all new floor tiles
-
Shower / tub Surround Tiles: up to 100 – 200 sf
-
Install all shower/tub tiles
-
Grout all new shower/tub tiles
-
Caulk junctions at corners shower and tub
-
Grout all new tile
Cabinetry
Vanity For Bathroom
Owner to provide all vanity, countertop
-
Install new vanity cabinet as selected by owner
-
Install new vanity mirror as selected by owner
Painting
Painting For Bathroom
-
Apply one full coat of primer to all interior walls, ceilings and trims
-
Fill and compound all necessary area and prepare for paint
-
Caulk all trim work
-
Apply two full coat of finish paint (any color) to walls/ceiling and door/trim (semigloss finish)
Final Cleanup
Cleanup For Bathroom
-
Final job site cleanup
-
Removal of all materials and waste.
-
Cleaning service as required if necessary
Project Managements Details
Rest assured that all permitting and inspection fees are covered in the project. Here’s what else you can expect in terms of project management:
-
A dedicated project manager will be assigned to oversee the job
-
Detailed architectural print and 3d design, including tiles and all fixtures
-
A job folder will be prepared with all relevant plans, details, and specifications
-
Daily job status updates will be provided
-
Scheduled project walk-through meetings will occur
-
A CLIENT PORTAL project website will be set up to manage project schedules, documents, and contacts
+30
Years basement remodeling and still counting
+1000
1000s of projects done and still counting
+1000
1000s of designs done and still counting
What Our Clients Are Saying
Rated 5/5 based online reviews from our customers (read reviews)
Our Trusted Trade Partners
Lets build your remodeling dream together!
Contact
Any questions? Get in touch
To receive your FREE BASEMENT ESTIMATE, please take a minute to complete this form. Before we schedule a Free Consultation, we’d like you to know more about your project.