An Inspiring Home is Closer Than You Think

Remodeling projects can be huge undertakings. We won’t use shoddy building materials or prescribe “quick fixes.” Quality takes time. That’s all there is to it. It wouldn’t be the same without it.

Depending on your budget, pricing varies greatly from project to project. We will tell you what ideas will work and what won’t during our initial conversation.

Check out the pricing below to get a better idea of what some of our projects cost. Remember, these are pricing based on past work we’ve completed. Every project is unique, and final costs will be provided.

HOW MUCH DOES IT COST TO REMODELING YOUR BATHROOM IN 2023-2024

GUEST HALL BATH

SMALL GUEST HALL BATH REMODELING

$39K+

Sitework

Job Site Preparation

  • Ensuring Safety with Dust Isolation and Temporary Walls as Needed

  • Manage Job Access by Installing Temporary Doors and Zip Walls

  • Safeguard your flooring’s finish by using a combination of rosin paper and hardboard

  • Our team ensures that the site is left spotless each day

  • For the duration of the project, all debris will be removed to the garage and disposed every week

Bathroom Demolition

All Demolition for Bathroom

  • Disconnect all bath fixtures and electrical components as needed

  • As needed, remove cabinetry and other finish

  • Complete bathroom demolition down to the studs

  • Remove any fixtures / appliances

  • Remove all walls and ceiling down to the studs

  • Remove all nails and clean joist

  • Removing the Finish Flooring

  • Sweep / vacuum

  • Remove all nails and clean joist

  • Remove the subfloor as necessary to install new plumbing

Framing

Wall framing for Bathroom will be install By Building Code

  • All plumbing fixtures and framing same lacation

  • Remove and replace sub floor as required for new plumbing

  • Framing walls for shower / tub, frame a in wall niche per print

  • Install all blocking and nailers as required by code

Insulation

All Insulation for Bathroom will be install By Building Code

  • Walls – Install R-15/19 Paper face Insulation

  • Ceiling – Install R-15/32 Paper face Insulation

  • Insulation, air/fire stopping for new construction

  • To ensure safety, it’s vital to install fire-stopping rock wool and caulking at all openings and penetrations 

Plumbing

All Plumbing for Bathroom will be install By Building Code

Owner to provide all plumbing fixtures

Toilet – Same Location

  • Install toilet drain and install new flange

  • Install new supply line and valve if necessary

  • Install toilet

Tub/Shower – Same Location

  • Rough in and supply for new tub/shower

  • Connect into existing vent

  • Install tub/shower

  • Install shower/tub valve and faucets

  • Install rough in waste and supply lines for shower/tub

Vanity Sink – Same Location

  • Install rough in waste and supply lines for vanity sink

  • Connect into existing vent

  • Install new sink and faucet

Electrical

All Electrical for Bathroom will be install By Building Code

Owner to provide all electrical fixtures

  • Furnish all electrical components necessary for the project

  • Disconnect any necessary wiring and reconfigure as needed

  • Supply and install new exhausts fan/light combo

  • Install wire for vanity light and mirror

  • Install new GFCI

  • Supply and install new led Ceiling Recessed Light per print

Hvac

All HVAC for Bathroom will be install By Building Code

  • Vent bathroom fan to exterior, using existing or new solid vent

  • Existing heating vent to remain as is and install new vent cover

Drywall

All Drywall for Bathroom

  • Install 1/2″ green board (GWB) on all walls and ceilings, (Ultralightweight drywall with moisture and mold resistance)

  • Matching existing finishes and patching up as necessary

  • Tape and metal/paper corners for all joints

  • Apply two coat plaster veneer finish

  • Sanding all drywall area and prepare for primer

Finish Carpentry

All Finish Carpentry for Bathroom

  • Install Door and Window casings

  • Install all paint grade door and window casings to match existing

  • Install floor baseboards

  • Install all baseboard trim

  • Paint grade baseboard

  • Matching the existing baseboard as needed

Tiles

All Tiles For Bathroom

Owner to provide all Tiles, Grout,

Install cement backerboard for all floors and shower walls

  • Bathroom Floor Tiles: up to 50 – 60 sf

  • Install all bathroom floor tiles as selected by owner

  • Use Latex modified thinnest mortar

  • Grout all new floor tiles

  • Shower / tub Surround Tiles: up to 50 – 80 sf

  • Install all shower/tub tiles

  • Grout all new shower/tub tiles

  • Caulk junctions at corners shower and tub

  • Grout all new tile

Cabinetry

Vanity For Bathroom

Owner to provide all vanity, countertop

  • Install new vanity cabinet as selected by owner

  • Install new vanity mirror as selected by owner

Painting

Painting For Bathroom

  • Apply one full coat of primer to all interior walls, ceilings and trims

  • Fill and compound all necessary area and prepare for paint

  • Caulk all trim work

  • Apply two full coat of finish paint (any color) to walls/ceiling and door/trim (semigloss finish)

Final Cleanup

Cleanup For Bathroom

  • Final job site cleanup

  • Removal of all materials and waste.

  • Cleaning service as required if necessary

Project Managements Details

Rest assured that all permitting and inspection fees are covered in the project. Here’s what else you can expect in terms of project management:

  • A dedicated project manager will be assigned to oversee the job

  • Detailed architectural print and 3d design, including tiles and all fixtures

  • A job folder will be prepared with all relevant plans, details, and specifications

  • Daily job status updates will be provided

  • Scheduled project walk-through meetings will occur

  • A CLIENT PORTAL project website will be set up to manage project schedules, documents, and contacts

BIG GUEST HALL BATH REMODELING

$49K+

Sitework

Job Site Preparation

  • Ensuring Safety with Dust Isolation and Temporary Walls as Needed

  • Manage Job Access by Installing Temporary Doors and Zip Walls

  • Safeguard your flooring’s finish by using a combination of rosin paper and hardboard

  • Our team ensures that the site is left spotless each day

  • For the duration of the project, all debris will be removed to the garage and disposed every week

Bathroom Demolition

All Demolition for Bathroom

  • Disconnect all bath fixtures and electrical components as needed

  • As needed, remove cabinetry and other finish

  • Complete bathroom demolition down to the studs

  • Remove any fixtures / appliances

  • Remove all walls and ceiling down to the studs

  • Remove all nails and clean joist

  • Removing the Finish Flooring

  • Sweep / vacuum

  • Remove all nails and clean joist

  • Remove the subfloor as necessary to install new plumbing

Framing

Wall framing for Bathroom will be install By Building Code

  • All plumbing fixtures and framing same lacation

  • Remove and replace sub floor as required for new plumbing

  • Framing walls for shower / tub, frame a in wall niche per print

  • Install all blocking and nailers as required by code

Insulation

All Insulation for Bathroom will be install By Building Code

  • Walls – Install R-15/19 Paper face Insulation

  • Ceiling – Install R-15/32 Paper face Insulation

  • Insulation, air/fire stopping for new construction

  • To ensure safety, it’s vital to install fire-stopping rock wool and caulking at all openings and penetrations 

Plumbing

All Plumbing for Bathroom will be install By Building Code

Owner to provide all plumbing fixtures

Toilet – Same Location

  • Install toilet drain and install new flange

  • Install new supply line and valve if necessary

  • Install toilet

Tub/Shower – Same Location

  • Rough in and supply for new tub/shower

  • Connect into existing vent

  • Install tub/shower

  • Install shower/tub valve and faucets

  • Install rough in waste and supply lines for shower/tub

Vanity Sink – Same Location

  • Install rough in waste and supply lines for vanity sink

  • Connect into existing vent

  • Install new sink and faucet

Electrical

All Electrical for Bathroom will be install By Building Code

Owner to provide all electrical fixtures

  • Furnish all electrical components necessary for the project

  • Disconnect any necessary wiring and reconfigure as needed

  • Supply and install new exhausts fan/light combo

  • Install wire for vanity light and mirror

  • Install new GFCI

  • Supply and install new led Ceiling Recessed Light per print

Hvac

All HVAC for Bathroom will be install By Building Code

  • Vent bathroom fan to exterior, using existing or new solid vent

  • Existing heating vent to remain as is and install new vent cover

Drywall

All Drywall for Bathroom

  • Install 1/2″ green board (GWB) on all walls and ceilings, (Ultralightweight drywall with moisture and mold resistance)

  • Matching existing finishes and patching up as necessary

  • Tape and metal/paper corners for all joints

  • Apply two coat plaster veneer finish

  • Sanding all drywall area and prepare for primer

Finish Carpentry

All Finish Carpentry for Bathroom

  • Install Door and Window casings

  • Install all paint grade door and window casings to match existing

  • Install floor baseboards

  • Install all baseboard trim

  • Paint grade baseboard

  • Matching the existing baseboard as needed

Tiles

All Tiles For Bathroom

Owner to provide all Tiles, Grout,

Install cement backerboard for all floors and shower walls

  • Bathroom Floor Tiles: up to 60 – 100 sf

  • Install all bathroom floor tiles as selected by owner

  • Use Latex modified thinnest mortar

  • Grout all new floor tiles

  • Shower / tub Surround Tiles: up to 60 – 100 sf

  • Install all shower/tub tiles

  • Grout all new shower/tub tiles

  • Caulk junctions at corners shower and tub

  • Grout all new tile

Cabinetry

Vanity For Bathroom

Owner to provide all vanity, countertop

  • Install new vanity cabinet as selected by owner

  • Install new vanity mirror as selected by owner

Painting

Painting For Bathroom

  • Apply one full coat of primer to all interior walls, ceilings and trims

  • Fill and compound all necessary area and prepare for paint

  • Caulk all trim work

  • Apply two full coat of finish paint (any color) to walls/ceiling and door/trim (semigloss finish)

Final Cleanup

Cleanup For Bathroom

  • Final job site cleanup

  • Removal of all materials and waste.

  • Cleaning service as required if necessary

Project Managements Details

Rest assured that all permitting and inspection fees are covered in the project. Here’s what else you can expect in terms of project management:

  • A dedicated project manager will be assigned to oversee the job

  • Detailed architectural print and 3d design, including tiles and all fixtures

  • A job folder will be prepared with all relevant plans, details, and specifications

  • Daily job status updates will be provided

  • Scheduled project walk-through meetings will occur

  • A CLIENT PORTAL project website will be set up to manage project schedules, documents, and contacts

MASTER BATHROOM REMODELING

SMALL MASTER BATHROOM REMODELING

$49K+

Sitework

Job Site Preparation

  • Ensuring Safety with Dust Isolation and Temporary Walls as Needed

  • Manage Job Access by Installing Temporary Doors and Zip Walls

  • Safeguard your flooring’s finish by using a combination of rosin paper and hardboard

  • Our team ensures that the site is left spotless each day

  • For the duration of the project, all debris will be removed to the garage and disposed every week

Bathroom Demolition

All Demolition for Bathroom

  • Disconnect all bath fixtures and electrical components as needed

  • As needed, remove cabinetry and other finish

  • Complete bathroom demolition down to the studs

  • Remove any fixtures / appliances

  • Remove all walls and ceiling down to the studs

  • Remove all nails and clean joist

  • Removing the Finish Flooring

  • Sweep / vacuum

  • Remove all nails and clean joist

  • Remove the subfloor as necessary to install new plumbing

Framing

Wall framing for Bathroom will be install By Building Code

  • Relocate the wall to make room for tub or shower

  • Remove and replace sub floor as required for new plumbing

  • Framing walls for shower / tub, frame a in wall niche per print

  • Install all blocking and nailers as required by code

Insulation

All Insulation for Bathroom will be install By Building Code

  • Walls – Install R-15/19 Paper face Insulation

  • Ceiling – Install R-15/32 Paper face Insulation

  • Insulation, air/fire stopping for new construction

  • To ensure safety, it’s vital to install fire-stopping rock wool and caulking at all openings and penetrations 

Plumbing

All Plumbing for Bathroom will be install By Building Code

Owner to provide all plumbing fixtures

Toilet

  • Install rough toilet drain and install new flange

  • Install new supply line and valve

  • Install toilet

Tub/Shower

  • Rough in and supply for new tub/shower

  • Connect into existing vent

  • Install tub/shower

  • Install shower/tub valve

  • Install rough in waste and supply lines for shower/tub

Install New Vanity Sink

  • Install rough in waste and supply lines for vanity sink

  • Connect into existing vent

  • Install new sink and faucet

Electrical

All Electrical for Bathroom will be install By Building Code

Owner to provide all electrical fixtures

  • Furnish all electrical components necessary for the project

  • Disconnect any necessary wiring and reconfigure as needed

  • Supply and install new exhausts fan/light combo

  • Install wire for vanity light and mirror

  • Install new GFCI

  • Supply and install new led Recessed Light per print

Hvac

All HVAC for Bathroom will be install By Building Code

  • Vent bathroom fan to exterior, using existing or new solid vent

  • Existing heating vent to remain as is and install new vent cover

Drywall

All Drywall for Bathroom

  • Install 1/2″ green board (GWB) on all walls and ceilings, (Ultralightweight drywall with moisture and mold resistance)

  • Matching existing finishes and patching up as necessary

  • Tape and metal/paper corners for all joints

  • Apply two coat plaster veneer finish

  • Sanding all drywall area and prepare for primer

Finish Carpentry

All Finish Carpentry for Bathroom

  • Install Door and Window casings

  • Install all paint grade door and window casings to match existing

  • Install floor baseboards

  • Install all baseboard trim

  • Paint grade baseboard

  • Matching the existing baseboard as needed

Tiles

All Tiles For Bathroom

Owner to provide all Tiles, Grout,

Install cement backerboard for all floors and shower walls

  • Bathroom Floor Tiles: up to 50 – 200 sf

  • Install all bathroom floor tiles as selected by owner

  • Use Latex modified thinnest mortar

  • Grout all new floor tiles

  • Shower / tub Surround Tiles: up to 100 – 200 sf

  • Install all shower/tub tiles

  • Grout all new shower/tub tiles

  • Caulk junctions at corners shower and tub

  • Grout all new tile

Cabinetry

Vanity For Bathroom

Owner to provide all vanity, countertop

  • Install new vanity cabinet as selected by owner

  • Install new vanity mirror as selected by owner

Painting

Painting For Bathroom

  • Apply one full coat of primer to all interior walls, ceilings and trims

  • Fill and compound all necessary area and prepare for paint

  • Caulk all trim work

  • Apply two full coat of finish paint (any color) to walls/ceiling and door/trim (semigloss finish)

Final Cleanup

Cleanup For Bathroom

  • Final job site cleanup

  • Removal of all materials and waste.

  • Cleaning service as required if necessary

Project Managements Details

Rest assured that all permitting and inspection fees are covered in the project. Here’s what else you can expect in terms of project management:

  • A dedicated project manager will be assigned to oversee the job

  • Detailed architectural print and 3d design, including tiles and all fixtures

  • A job folder will be prepared with all relevant plans, details, and specifications

  • Daily job status updates will be provided

  • Scheduled project walk-through meetings will occur

  • A CLIENT PORTAL project website will be set up to manage project schedules, documents, and contacts

BIG MASTER BATHROOM REMODELING

$69K+

Sitework

Job Site Preparation

  • Ensuring Safety with Dust Isolation and Temporary Walls as Needed

  • Manage Job Access by Installing Temporary Doors and Zip Walls

  • Safeguard your flooring’s finish by using a combination of rosin paper and hardboard

  • Our team ensures that the site is left spotless each day

  • For the duration of the project, all debris will be removed to the garage and disposed every week

Bathroom Demolition

All Demolition for Bathroom

  • Disconnect all bath fixtures and electrical components as needed

  • As needed, remove cabinetry and other finish

  • Complete bathroom demolition down to the studs

  • Remove any fixtures / appliances

  • Remove all walls and ceiling down to the studs

  • Remove all nails and clean joist

  • Removing the Finish Flooring

  • Sweep / vacuum

  • Remove all nails and clean joist

  • Remove the subfloor as necessary to install new plumbing

Framing

Wall framing for Bathroom will be install By Building Code

  • Relocate the wall to make room for tub or shower

  • Remove and replace sub floor as required for new plumbing

  • Framing walls for shower / tub, frame a in wall niche per print

  • Install all blocking and nailers as required by code

Insulation

All Insulation for Bathroom will be install By Building Code

  • Walls – Install R-15/19 Paper face Insulation

  • Ceiling – Install R-15/32 Paper face Insulation

  • Insulation, air/fire stopping for new construction

  • To ensure safety, it’s vital to install fire-stopping rock wool and caulking at all openings and penetrations 

Plumbing

All Plumbing for Bathroom will be install By Building Code

Owner to provide all plumbing fixtures

Toilet

  • Install rough toilet drain and install new flange

  • Install new supply line and valve

  • Install toilet

Tub/Shower

  • Rough in and supply for new tub/shower

  • Connect into existing vent

  • Install tub/shower

  • Install shower/tub valve

  • Install rough in waste and supply lines for shower/tub

Install New Vanity Sink

  • Install rough in waste and supply lines for vanity sink

  • Connect into existing vent

  • Install new sink and faucet

Electrical

All Electrical for Bathroom will be install By Building Code

Owner to provide all electrical fixtures

  • Furnish all electrical components necessary for the project

  • Disconnect any necessary wiring and reconfigure as needed

  • Supply and install new exhausts fan/light combo

  • Install wire for vanity light and mirror

  • Install new GFCI

  • Supply and install new led Recessed Light per print

Hvac

All HVAC for Bathroom will be install By Building Code

  • Vent bathroom fan to exterior, using existing or new solid vent

  • Existing heating vent to remain as is and install new vent cover

Drywall

All Drywall for Bathroom

  • Install 1/2″ green board (GWB) on all walls and ceilings, (Ultralightweight drywall with moisture and mold resistance)

  • Matching existing finishes and patching up as necessary

  • Tape and metal/paper corners for all joints

  • Apply two coat plaster veneer finish

  • Sanding all drywall area and prepare for primer

Finish Carpentry

All Finish Carpentry for Bathroom

  • Install Door and Window casings

  • Install all paint grade door and window casings to match existing

  • Install floor baseboards

  • Install all baseboard trim

  • Paint grade baseboard

  • Matching the existing baseboard as needed

Tiles

All Tiles For Bathroom

Owner to provide all Tiles, Grout,

Install cement backerboard for all floors and shower walls

  • Bathroom Floor Tiles: up to 50 – 200 sf

  • Install all bathroom floor tiles as selected by owner

  • Use Latex modified thinnest mortar

  • Grout all new floor tiles

  • Shower / tub Surround Tiles: up to 100 – 200 sf

  • Install all shower/tub tiles

  • Grout all new shower/tub tiles

  • Caulk junctions at corners shower and tub

  • Grout all new tile

Cabinetry

Vanity For Bathroom

Owner to provide all vanity, countertop

  • Install new vanity cabinet as selected by owner

  • Install new vanity mirror as selected by owner

Painting

Painting For Bathroom

  • Apply one full coat of primer to all interior walls, ceilings and trims

  • Fill and compound all necessary area and prepare for paint

  • Caulk all trim work

  • Apply two full coat of finish paint (any color) to walls/ceiling and door/trim (semigloss finish)

Final Cleanup

Cleanup For Bathroom

  • Final job site cleanup

  • Removal of all materials and waste.

  • Cleaning service as required if necessary

Project Managements Details

Rest assured that all permitting and inspection fees are covered in the project. Here’s what else you can expect in terms of project management:

  • A dedicated project manager will be assigned to oversee the job

  • Detailed architectural print and 3d design, including tiles and all fixtures

  • A job folder will be prepared with all relevant plans, details, and specifications

  • Daily job status updates will be provided

  • Scheduled project walk-through meetings will occur

  • A CLIENT PORTAL project website will be set up to manage project schedules, documents, and contacts

+30

Years basement remodeling and still counting

+1000

1000s of projects done and still counting

+1000

1000s of designs done and still counting

What Our Clients Are Saying

Rated 5/5 based online reviews from our customers (read reviews)

Excellent
Based on 21 reviews
Joseph Munoz
Joseph Munoz
September 20, 2023.
The quality of materials used by Reliable Basement Finishing is top-notch. Our basement not only looks amazing but also feels durable and long-lasting.
Najma Ray
Najma Ray
September 20, 2023.
Reliable Basement Finishing brought our vision to life. They took the time to understand our needs and preferences, resulting in a basement that reflects our style perfectly.
Hamida Ray
Hamida Ray
September 20, 2023.
Very Reliable, 5 stars they did a great job on our 4 bedroom ranch.
Martyna Szettel
Martyna Szettel
September 12, 2023.
Reliable Basement did an outstanding job with our kitchen & bath renovation. Even though we didn't make any structural changes, it transformed our house. Adam was very professional and on time!
Peter Bee
Peter Bee
July 28, 2023.
Adam and his team are simply phenomenal! I've been recommending his contact information for a remarkable 15 years now, ever since he completed the basement remodeling for my home. Even after several years, the transformation is still awe-inspiring. It's no wonder he's become the go-to contractor for all my close friends and family members when it comes to basement transformations. Unlike typical contractors, he remains engaged throughout the entire process, welcoming and valuing the input of his clients. This level of communication and collaboration ensures that the end result truly reflects the client's vision. If you're in need of a skilled and reliable contractor for your home improvement projects, look no further than Adam at Reliable Basement Finishing. From breathtaking custom trim works to modern and stylish basement transformations, he consistently delivers unparalleled results. I wholeheartedly recommend Adam and his team for any remodeling project you have in mind.
Pawel Czacharowski
Pawel Czacharowski
June 15, 2023.
We choose Reliable because was easy proces start to finish, our basement looks great, nice 3d design before start the project, I will recommended Adam and Reliable, thank you.
Dan Flores
Dan Flores
June 1, 2023.
These guys are the real deal! I'm so happy I went with Reliable Basement Finishing instead of a really large outfit. They made me feel like I was their only customer. The attention to detail and craftsmanship is outstanding, and prices are very fair. I highly recommend them to say the least! Take a look at the photos and videos. The way they maximized the space is incredible. Keep in mind I also have a storage room, mechanical room and two closets. It's impressive how they worked with me on design, and made this happen. Wow!
Anuj Srivastava
Anuj Srivastava
May 13, 2023.
Need to schedule them
sunny k
sunny k
April 30, 2023.
Reliable Basement Finishing is a very good firm, they did our basement remodeling which included a home theater, game area, closets etc. They are competent and bring high quality workmanship. The customer service is great as well, we had to get a fix done to our radon panel access after several years and they came out gladly to get the job done. They had archives of our designs and floor map. Adam and team are nice people to work with on a remodeling project.
ZBIGNIEW KARAS
ZBIGNIEW KARAS
January 17, 2023.
I couldn't be happier with the results. The team was professional, efficient, and always kept me informed throughout the process. They transformed my dark and damp basement into a beautiful living space that my family and I now enjoy. The quality of work is top-notch and I would highly recommend Reliable Basement Remodeling to anyone looking for a reliable and skilled remodeling contractor Thank you!

Our Trusted Trade Partners

Lets build your remodeling dream together!

Contact

Any questions? Get in touch

To receive your FREE BASEMENT ESTIMATE, please take a minute to complete this form. Before we schedule a Free Consultation, we’d like you to know more about your project.

Get in touch with us

Do you want to keep up to date?