Bathroom Remodeling Chicago | 30+ Years Experience | Free Estimate

Your Blueprint to

Luxury Bathroom

Starts Today

Permit‑ready 3D designs + architectural blueprints. No guesswork, just results.

100%
Accurate

30+ Years
Design experts

5/5
Google rating

START YOUR PROJECT FOR

$28,000

Regular or Master bathroom • 3D + blueprint

Free In‑home consultation • precise measure • full 3D design • permit‑ready drawings • free vanity design • free tile design • free fixtures and tiles pick up.

100% accurate construction contract

2026 Pricing - Bathroom Remodeling, Blueprint and 3D Design

Fixed price, no hidden fees. Get everything you need to build.

Regular Bathroom Starts

$28,000

What is included
  • Job Site Preparation
  • All Demolition
  • Wall framing
  • Insulation
  • Plumbing
  • Electrical
  • HVAC
  • Drywall
  • Doors
  • Finish Carpentry
  • Tiles
  • Cabinetry
  • Painting
  • Cleanup
  • Project Management

Master Bathroom Starts

$32,000

What is included
  • Job Site Preparation
  • All Demolition
  • Wall framing
  • Insulation
  • Plumbing
  • Electrical
  • HVAC
  • Drywall
  • Doors
  • Finish Carpentry
  • Tiles
  • Cabinetry
  • Painting
  • Cleanup
  • Project Management

Bathroom Remodeling Detailed Scope Of Work

Job Site Preparation

  • Ensuring Safety with Dust Isolation and Temporary Walls as Needed
  • Manage Job Access by Installing Temporary Doors and Zip Walls
  • Safeguard your flooring’s finish by using a combination of rosin paper and hardboard
  • Our team ensures that the site is left spotless each day
  • For the duration of the project, all debris will be removed to the garage and disposed every week

All Demolition for Bathroom

  • Disconnect all bath fixtures and electrical components as needed

  • As needed, remove cabinetry and other finish

  • Complete bathroom demolition down to the studs

  • Remove any fixtures / appliances

  • Remove all walls and ceiling down to the studs

  • Remove all nails and clean joist

  • Removing the Finish Flooring

  • Sweep / vacuum

  • Remove all nails and clean joist

  • Remove the subfloor as necessary to install new plumbing

Wall framing for the Bathroom will be installed by the Building Code

  • All plumbing fixtures and framing same lacation

  • Remove and replace sub floor as required for new plumbing

  • Framing walls for shower / tub, frame a in wall niche per print

  • Install all blocking and nailers as required by code

All Insulation for the Bathroom will be installed by the Building Code

  • Walls – Install R-15/19 Paper face Insulation

  • Ceiling – Install R-15/32 Paper face Insulation

  • Insulation, air/fire stopping for new construction

  • To ensure safety, it’s vital to install fire-stopping rock wool and caulking at all openings and penetrations 

All Plumbing for the Bathroom will be installed by the Building Code

The owner is to provide all plumbing fixtures

Toilet – Same Location

  • Install the toilet drain and install a new flange

  • Install a new supply line and valve if necessary

  • Install toilet

Tub/Shower – Same Location

  • Rough in and supply for new tub/shower

  • Connect to the existing vent

  • Install tub/shower

  • Install the shower/tub valve and faucets

  • Install rough-in waste and supply lines for shower/tub

Vanity Sink – Same Location

  • Install rough in waste and supply lines for vanity sink

  • Connect into existing vent

  • Install new sink and faucet

All Electrical for the Bathroom will be installed by the Building Code

The owner is to provide all electrical fixtures

  • Furnish all electrical components necessary for the project

  • Disconnect any necessary wiring and reconfigure as needed

  • Supply and install a new exhaust fan/light combo

  • Install wire for vanity light and mirror

  • Install new GFCI

  • Supply and install new LED ceiling Recessed Light per print

All HVAC for the Bathroom will be installed by the Building Code

  • Vent bathroom fan to exterior, using existing or new solid vent

  • Existing heating vent to remain as is, and install a new vent cover

All Drywall for Bathroom

  • Install 1/2″ green board (GWB) on all walls and ceilings, (Ultralightweight drywall with moisture and mold resistance)

  • Matching existing finishes and patching up as necessary

  • Tape and metal/paper corners for all joints

  • Apply two coat plaster veneer finish

  • Sanding all drywall area and prepare for primer

All Doors for Bathroom

  • Install new interior door per print

All Finish Carpentry for Bathroom

  • Install Door and Window casings

  • Install all paint grade door and window casings to match existing

  • Install floor baseboards

  • Install all baseboard trim

  • Paint grade baseboard

  • Matching the existing baseboard as needed

All Tiles For Bathroom
Owner to provide all Tiles, Grout,

Install cement backer board for all floors and shower walls

  • Bathroom Floor Tiles: up to 50 – 60 sf

  • Install all bathroom floor tiles as selected by owner

  • Use Latex modified thinnest mortar

  • Grout all new floor tiles

  • Shower / tub Surround Tiles: up to 50 – 80 sf

  • Install all shower/tub tiles

  • Grout all new shower/tub tiles

  • Caulk junctions at corners shower and tub

  • Grout all new tile

Vanity For Bathroom Owner to provide vanity, countertop

  • Install new vanity cabinet as selected by owner

  • Install new vanity mirror as selected by owner

Painting For the Bathroom

  • Apply one full coat of primer to all interior walls, ceilings, and trims
  • Fill and compound all necessary areas and prepare for painting
  • Caulk all trim work
  • Apply two full coats of finish paint (any color) to walls/ceiling and door/trim (semigloss finish)

Cleanup For the Bathroom

  • Final job site cleanup
  • Removal of all materials and waste.
  • Cleaning service as required, if necessary

Rest assured that all permitting and inspection fees are covered in the project. Here’s what else you can expect in terms of project management:

  • A dedicated project manager will be assigned to oversee the job
  • Detailed architectural print and 3d design, including tiles and all fixtures
  • A job folder will be prepared with all relevant plans, details, and specifications
  • Daily job status updates will be provided
  • Scheduled project walk-through meetings will occur
  • A CLIENT PORTAL project website will be set up to manage project schedules, documents, and contacts
  • 12 Months warranty for construction and installation

Recent projects & design ideas

Southridge Trail Bathroom Remodel

Algonquin Southridge Trail bathroom remodel featuring a modern layout, custom walk-in shower, and high-quality finishes. This full renovation focuses…

Spruce Tree Ln – Bathroom Remodel

Algonquin Spruce Tree Ln bathroom remodel featuring a modern layout, custom walk-in shower, and high-quality finishes. This renovation focuses…

Colonel Holcomb Dr. – Bathroom Remodel

Crystal Lake Colonel Holcomb Dr bathroom remodel featuring a modern layout, custom walk-in shower, and high-quality finishes. This renovation…

Get FreeBathroom Remodeling Estimate

Get a free estimate for your bathroom remodeling project and work with experts who specialize in custom design, tile installation, and complete renovations, all delivered with quality workmanship and a 12-Months Warranty. Our team carefully evaluates your space and creates solutions tailored to your style, needs, and budget. From planning to final installation, we handle every detail to ensure a smooth, stress-free experience and a beautiful, long-lasting result.

Difference Our Work Makes

Real Reviewsfrom Our Recent Remodeling Work

Reliable Bathroom Remodeling place picture
5.0
Based on 51 reviews
powered by Google
We wanted a heated floor but didn't want to tear up the whole bathroom. The bathroom remodeler worked with us to install an electric radiant mat under just the tile in front of the vanity and toilet—about 20 square feet. They tied it into a programmable thermostat on the wall, and now we have warm toes every morning without the cost of heating the whole room. They even showed us how to test the mat continuity before tiling over it. That attention to detail gave us so much peace of mind.
Sue Staples profile picture
Sue Staples
19:18 13 Apr 26
Our bathroom floor was vinyl sheet that was peeling at the seams. The remodeler removed it and found some rotted plywood underneath from an old toilet leak. They cut out the damaged section, sistered new joists, and laid a cement backer board before installing beautiful large-format porcelain tile with a warm gray grout. They used a leveling system so there are no lippage issues, and they sealed the grout to prevent stains. The floor is perfectly flat and feels warm underfoot with our new radiant heat mat.
PRIAN OLAVARRIA profile picture
PRIAN OLAVARRIA
17:29 11 Apr 26
Our builder-grade vanity was falling apart, and the countertop was stained beyond repair. The remodeler custom-built a floating walnut vanity to fit an awkward alcove in our bathroom. They measured twice, cut the plywood box on-site, and installed a quartz remnant countertop with an under-mount sink. They even routed a hidden finger pull so we didn't need handles. The craftsmanship is incredible—dovetail drawers, soft-close slides, and a perfect seal around the sink. It's the nicest piece of furniture in our house now.
Daniel Cantera profile picture
Daniel Cantera
18:53 10 Apr 26
We had a cast iron tub that weighed a ton and was set into a tile surround. The bathroom remodeler brought a special dolly and three guys to get it out without damaging the subfloor or the hallway walls. They replaced it with a lightweight, deep soaking tub from a brand I'd never heard of, but they recommended it because it holds heat better. They also added a handheld sprayer and a brushed nickel tub filler. I've taken a bath almost every night since. Pure luxury.
Frances Rose profile picture
Frances Rose
18:52 09 Apr 26
Our bathroom had no ventilation except a tiny, noisy window. The remodeler cut a hole in the ceiling, ran a new duct to the exterior gable, and installed a super-quiet Panasonic fan with a humidity sensor. They even patched the drywall and textured it to match the rest of the ceiling. Now the mirror never fogs up, and there's zero mildew on the paint. It's one of those little upgrades you don't think about until you have it, and now I can't imagine living without it.
Mohammad Kadyn profile picture
Mohammad Kadyn
22:27 06 Mar 26
The tile work in here is absolutely stunning. I'm the type of person who notices every little imperfection and I was worried I'd find something to complain about. But these guys are true craftsmen. The grout lines are perfect, the corners are crisp, the shower niche lines up exactly with the tile pattern. I find myself just standing in the doorway staring at it. It's been three months and I still get that little thrill every time I walk in. Worth every single penny.
Yahir Bo profile picture
Yahir Bo
11:09 05 Mar 26
My husband passed away two years ago and he was always the one who handled projects around the house. Our guest bath had a leaky faucet and a weird smell I couldn't fix and I just felt so overwhelmed. I finally made some calls and found these guys. They treated me with such kindness, didn't talk down to me, explained everything clearly. Now that bathroom is beautiful and functional and I did it on my own. It feels empowering honestly. Thank you for being so patient with me.
Elena Eliza profile picture
Elena Eliza
04:47 04 Mar 26
We have three kids and one hallway bathroom and I was terrified of being without it for weeks. The timeline they gave us was spot on, they showed up every single day on time and got to work. The crew was so respectful, they even laid down tarps every morning to protect our floors through the house. Now the kids fight over who gets to use the fancy new shower. It sounds crazy but having that nice space in the morning just starts my whole day off better. Highly recommend.
Ann Kayden profile picture
Ann Kayden
11:23 02 Mar 26
I was so nervous about starting this project, honestly I'd been putting it off for years because I was scared of the mess and the cost. But our master bath was straight out of 1985 and the grout was literally crumbling. From the first consult, they put me at ease. They walked me through every step and when they started demolition I was braced for disaster but they kept everything contained and clean. Now I have a shower I actually want to show off to guests. Best decision I've made for this house.
elijah 987elijah profile picture
elijah 987elijah
18:48 02 Jan 26
Our bathroom went from outdated to absolutely beautiful. The attention to detail-especially in the tile work and fixtures-was impressive. These guys clearly take pride & appreciated in their craftsmanship. Highly recommend them if you want quality work done right.

Our Trusted Trade Partners